Foundation complete in Laurel Falls
Footings poured in Laurel Falls
Foundation and waterproofing complete. Framing started in Burlingame
Rock work complete at Bald Rock
Form work in Burlingame
Concrete forms moved in to start foundation walls in Burlingame
Progress at Black Oak
We found some beautiful chanterelles while walking a new lot
Started a new project in Laurel Falls
This will be a custom version of our new Sycamore design.
Trim at Bald Rock
Started digging the footings in Burlingame
Installing rock and tile in Eagle Ridge
Hanging sheetrock at Black Oak
Finished with the N Buckberry home
We are really happy with the way this new plan turned out. This is our new Sycamore design. The main floor is the same layout as the Sassafras but the two secondary bedrooms and baths are upstairs instead of on the lower level. There is a spacious open loft on the upper level.
Paving the driveway at North Buckberry
Just a few weeks and we will be finished with this home.
New project in Burlingame
We have started a new custom home. This will be our Sassafras plan with a full basement. This lot has over 200' of river frontage on the Horsepasture river.
Black bear visited our home
Interior trim in progress at Eagle Ridge
Exterior painting at Black Oak
We are almost complete with the mechanical rough in and should be insulating soon.